Saturday, May 21, 2011

Plumbing Fixtures

Carter made it out to the house this morning. The old truck is already moved in! Mom and Dad left it there last week because the next time Dad is there he'll be driving the moving truck.

Last Saturday Kerras delivered the birch for the main floor. It is stacked on the second floor until it gets installed.
 
 

The tub arrived while Mom and Dad were there and now it's ready to use!
The telephone faucet is installed.
The vanity is installed but the sink isn't attached yet. It will be mounted underneath the marble counter.
The faucets are oil rubbed bronze and the sink is copper.
The transom above the bathroom door.
The old iron sink has also been installed in the basement, with new faucets.
 
 
The pine walls are finished.
 
 

 
 
 
 
And the most important thing. For the first time ever, the house has a real toilet.
 
 
 
 