Monday, April 4, 2011

Pictures from Mike

Mike my contractor sent me some photos showing that the shingling is done on all walls except the tall north wall and the kitchen porch door wall, which will be completed Tuesday. Then they can move inside and get started at the insulating and drywalling. 

 
 
 
 
These are shots of the radiant heat tubing in the floors
 
Below is the boiler for the radiant system. This is located in the mechanical room below the new Parlour. Thanks for the pictures Mike!