More changes to the plan. I had a drain installed at the west wall of the basement kitchen for an eventual sink, and decided to put the sink in now. Below is the salvaged sink I just bought from Kerras.
The sink comes with a foot.
I also added three closets to the plan. One under the basement stairs, a walk-in closet in the basement bedroom, and one on the main floor for a vacuum, coats and stuff like that. So, I need doors. Below are the doors, also supplied by Kerras. These are similar to the originals in the house, and judging from their style, they are from the last quarter of the 19th century, maybe older.
Once the doors arrive at the house, the interior framing can be completed.
No comments:
Post a Comment